VA Lenders Handbook (VA Pamphlet 26-7), Chapter 12, Topic 34 — Radon Gas

va-m26-7-ch12-t34

VA Lenders Handbook (VA Pamphlet 26-7), Chapter 12, Topic 34 — Radon Gas.

Get this register: .xlsx .csv Full text PDF More bundles →

Verbatim regulatory text (1)

Verbatim provisions from VA Lenders Handbook (VA Pamphlet 26-7), Chapter 12, Topic 34 — Radon Gas — each quote is a verified substring of the regulator-published source snapshot, not retyped. Quoted for reference; this is not legal advice. The operational layer (P&P updates, prompts) lives in the regulation update kits.

VA Pamphlet 26-7, Chapter 12 (Minimum Property Requirement), Topic 34 — Radon Gas

Effective 2019-10-18 · VA Change Date for this topic

• This chapter has been revised in its entirety. a. Testing Recommended by VA On the NOV that is provided to Veterans with the results of the appraisal, VA recommends testing for radon gas. b. Builder Certification On proposed and new construction cases, the builder must certify that radon resistant construction techniques were used where applicable and construction meets any local or state building codes for radon control. Radon resistant construction techniques are considered to be applicable for properties located in Radon Zone 1 as designated by the EPA at the following website: https://geopub.epa.gov/Radon/. Additional information about radon resistant construction techniques is available at the following link: https://www.epa.gov/radon/radon-resistant-construction-basics-andtechniques. c. Additional Information Additional information about radon gas is available at the following link: https://www.epa.gov/radon.

Source: VA Pamphlet 26-7, Chapter 12 (Minimum Property Requirement), Topic 34 — Radon Gas · source URL · snapshot 824171a914866a59

Operationalizing VA Lenders Handbook (VA Pamphlet 26-7), Chapter 12, Topic 34 — Radon Gas

This is verbatim, source-snapshotted regulator text from the Claude for Compliance open corpus. To turn a rule like this into compliance work product: gap-analyze your policies and procedures (P&Ps) against these requirements to surface stale, conflicting, or missing provisions; operationalize any change with a ready-to-run update kit; and produce audit-ready evidence — every step grounded only in the regulator’s own words, never invented.

To work from the whole rulebook rather than this one page: download the corpus — every register on this site, verbatim, each with its source snapshot and effective date — then follow the methodology. It asks your assistant to answer only from the downloaded text, cite the register id and effective date it used, and tell you when the corpus does not cover something instead of filling the gap from memory. Running it locally also means no one sees which regulations you are looking at.

Source of record: https://claudeforcompliance.com/regs/va-m26-7-ch12-t34/ · register va-m26-7-ch12-t34 · Claude for Compliance. Free to read and download; see regulatory updates and methodology.