USDA Technical Handbook HB-1-3555 §12.27 — Unplanned Changes During Construction
USDA HB-1-3555 §12.27 (Unplanned Changes During Construction). Gap-fill (verbatim).
Verbatim regulatory text
Verbatim provisions from USDA Technical Handbook HB-1-3555 §12.27 — Unplanned Changes During Construction — each quote is a verified substring of the regulator-published source snapshot, not retyped. Quoted for reference; this is not legal advice. The operational layer (P&P updates, prompts) lives in the regulation update kits.
USDA HB-1-3555 12.27 — Unplanned Changes During Construction
PLANNED CHANGES DURING CONSTRUCTION Should a life change occur with the borrower, such as loss of job or death occurs, the lender remains responsible to work with the builder to complete the home. The loan will be serviced in accordance with Chapters 18 through 20 of this Handbook, as applicable.