FHA Single Family Housing Policy Handbook 4000.1, II. ORIGINATION THROUGH POST-CLOSING/ENDORSEMENT > A. Title II Insured Housing Programs Forward Mortgages > 8. Programs and Products - New Construction (11/10/2026) — i. New Construction
HUD publishes this section under more than one citation path, so it appears at more than one address here. This page is a duplicate of the primary page for the same section, which carries the identical verbatim text. Search engines are pointed there.
What moves on this page
HUD Handbook 4000.1 section "Programs and Products - New Construction". Gap-fill (verbatim, title-diff).
Verbatim regulatory text
Verbatim provisions from FHA Single Family Housing Policy Handbook 4000.1, II. ORIGINATION THROUGH POST-CLOSING/ENDORSEMENT > A. Title II Insured Housing Programs Forward Mortgages > 8. Programs and Products - New Construction (11/10/2026) — i. New Construction — each quote is a verified substring of the regulator-published source snapshot, not retyped. Quoted for reference; this is not legal advice. The operational layer (P&P updates, prompts) lives in the regulation update kits.
HUD Handbook 4000.1
In force by default — effective 2025-06-27. This is the version that governs unless your firm has adopted the Update 18 revision.
8 sections · 14,227 characters of verbatim text. Open a section to read it, or . Every section below is in the page source whether open or closed.
iNew Construction (06/27/2025)998 ch
i. New Construction (06/27/2025) i. Definitions [Updates to this section must be implemented for case numbers assigned on or after January 4, 2021] New Construction refers to Proposed Construction, Properties Under Construction, and Properties Existing Less than One Year as defined below: • Proposed Construction refers to a Property where no concrete or permanent material has been placed. Digging of footing is not considered permanent. • Under Construction refers to the period from the first placement of permanent material to 100 percent completion with no Certificate of Occupancy (CO) or equivalent. • Existing Less than One Year refers to a Property that is 100 percent complete and has been completed less than one year from the date of the issuance of the CO or equivalent. The Property must have never been occupied. FHA treats the sale of an occupied Property that has been completed less than one year from the issuance of the CO or equivalent as an existing Property.
iiEligible Property Types [Updates to this section must be implemented for case428 ch
ii. Eligible Property Types [Updates to this section must be implemented for case numbers assigned on or after January 4, 2021] The following property types are eligible for New Construction financing: • Site Built Housing (one- unit, one-unit with an Accessory Dwelling Unit (ADU), or two- to four-units) • Condominium units in Approved Projects or Legal Phases • Manufactured Housing (one-unit or one-unit with an ADU)
iiiRequired Inspections for New Construction Financing [Updates to this section4,132 ch
iii. Required Inspections for New Construction Financing [Updates to this section159 ch
iii. Required Inspections for New Construction Financing [Updates to this section must be implemented for case numbers assigned on or after January 4, 2021]
ASite Built Housing (By Construction Status at Time of Appraisal)1,867 ch
(A) Site Built Housing (By Construction Status at Time of Appraisal) The Mortgagee must obtain: (1) Proposed Construction • copies of the building permit (or equivalent) and CO (or equivalent); or • three inspections (footing, framing and final) performed by the local authority with jurisdiction over the Property or an ICC certified RCI or CI (for Modular Housing, footing and final only); or • in the absence of such ICC certified RCI or CI, the Mortgagee may obtain three inspections (footing, framing and final) performed by a disinterested third party, who is a registered architect, a structural engineer, or a qualified trades person or contractor, and has met the licensing and bonding requirements of the state in which the Property is located. (2) Under Construction • copies of the building permit (or equivalent) and CO (or equivalent); or • a final inspection issued by the local authority with jurisdiction over the Property or by an ICC certified RCI or CI; or • in the absence of such ICC certified RCI or CI, the Mortgagee may obtain a final inspection performed by a disinterested third party, who is a registered architect, a structural engineer, or a qualified trades person or contractor, and has met the licensing and bonding requirements of the state in which the Property is located. (3) Existing Less than One Year • a copy of the CO (or equivalent); or • a final inspection issued by the local authority with jurisdiction over the Property or by an ICC certified RCI or CI; or • in the absence of such ICC certified RCI or CI, the Mortgagee may obtain a final inspection performed by a disinterested third party, who is a registered architect, a structural engineer, or a qualified trades person or contractor, and has met the licensing and bonding requirements of the state in which the Property is located.
BManufactured Housing (By Construction Status at Time of Appraisal)1,975 ch
(B) Manufactured Housing (By Construction Status at Time of Appraisal) Inspection Requirements The Mortgagee must obtain: (1) Proposed Construction • copies of the building permit, (or equivalent) and CO (or equivalent); or • two inspections (initial and final) performed by the local authority with jurisdiction over the Property or an ICC certified RCI or CI; or • in the absence of a local authority with building code jurisdiction or ICC certified RCI or CI, the Mortgagee may obtain two inspections (initial and final) performed by a disinterested third party, who is a registered architect, a structural engineer, or a qualified trades person or contractor, and has met the licensing and bonding requirements of the state in which the Property is located. (2) Under Construction • copies of the building permit, (or equivalent) and CO (or equivalent); or • a final inspection performed by the local authority with jurisdiction over the Property or an ICC certified RCI or CI; or • in the absence of a local authority with building code jurisdiction or ICC certified RCI or CI, the Mortgagee may obtain a final inspection performed by a disinterested third party, who is a registered architect, a structural engineer, or a qualified trades person or contractor, and has met the licensing and bonding requirements of the state in which the Property is located. (3) Existing Less than One Year • a copy of the CO (or equivalent); or • a final inspection performed by the local authority with jurisdiction over the Property or an ICC certified RCI or CI; or • in the absence of a local authority with building code jurisdiction or ICC certified RCI or CI, the Mortgagee may obtain a final inspection performed by a disinterested third party, who is a registered architect, a structural engineer, or a qualified trades person or contractor, and has met the licensing and bonding requirements of the state in which the Property is located.
CUnits in Condominium Project or Legal Phase (Existing Less Than One131 ch
(C) Units in Condominium Project or Legal Phase (Existing Less Than One Year) The Mortgagee must obtain a CO or its equivalent.
ivRequired Documentation for New Construction Financing [Updates to this2,261 ch
iv. Required Documentation for New Construction Financing [Updates to this section must be implemented for case numbers assigned on or after January 4, 2021] The Mortgagee must obtain and include the following documents in the case binder: • form HUD-92541, Builder’s Certification of Plans, Specifications, and Site; • form HUD-92544, Warranty of Completion of Construction; • required inspections, as applicable: • inspections performed by an ICC certified RCI or CI or a third-party, who is a registered architect, a structural engineer, or a qualified tradesperson or contractor must be reported on form HUD-92051, Compliance Inspection Report, or on an appropriate state-sanctioned inspection form; and • when a third party, who is a registered architect, a structural engineer, or a qualified tradesperson or contractor, is relied upon for required inspections due to the absence of an ICC certified RCI or CI, a certification from such inspector that they are licensed and bonded under applicable state and local laws to perform the type of inspection completed must be included; • Wood Infestation Report, unless the Property is located in a county listed as not required on HUD’s “Termite Treatment Exception Areas” list: o Form HUD-NPMA-99-A, Subterranean Termite Protection Builder’s Guarantee, is required for all New Construction. If the building is constructed with steel, masonry or concrete building components with only minor interior wood trim and roof sheathing, no treatment is needed. The Mortgagee must ensure that the builder notes on the form that the construction is masonry, steel, or concrete. o Form HUD-NPMA-99-B, New Construction Subterranean Termite Service Record, is required when the New Construction Property is treated with one of the following: Termite Bait System, Field Applied Wood Treatment, soil chemical termiticide, or Physical Barrier System is installed, as reflected on form HUD-NPMA-99-A. The Mortgagee must reject the use of post construction soil treatment when the termiticide is applied only around the perimeter of the foundation. • local health authority or qualified lab well water analysis; and • septic report, where required by the local jurisdictional authority.
vDocuments to be Provided to Appraiser at Assignment669 ch
v. Documents to be Provided to Appraiser at Assignment The Mortgagee must provide the Appraiser with a fully executed form HUD-92541, signed and dated no more than 30 Days prior to the date the appraisal was ordered. For Properties 90 percent completed or less, the Mortgagee must provide a copy of the floor plan, plot plan, and any other exhibits necessary to allow the Appraiser to determine the size and level of finish of the house they are appraising. For Properties greater than 90 percent but less than 100 percent completed, the Mortgagee must provide the Appraiser with a list of components to be installed or completed after the date of inspection.
viProperty Considerations142 ch
vi. Property Considerations New Construction must meet HUD’s Minimum Property Requirements (MPR) and Minimum Property Standards (MPS).
viiMortgagee Review of Appraisal5,325 ch
vii. Mortgagee Review of Appraisal61 ch
vii. Mortgagee Review of Appraisal (A) Site Considerations
1Environmental276 ch
(1) Environmental The Mortgagee must require corrective work to mitigate any condition that arises during construction that may affect the health and safety of the occupants, the Property’s ability to serve as collateral, or the structural soundness of the improvements.
2Operating Oil or Gas Wells206 ch
(2) Operating Oil or Gas Wells If a New Construction dwelling is located within 75 feet of an operating oil or gas well, the Mortgagee must reject the Property unless mitigation measures are completed.
3Slush Pits215 ch
(3) Slush Pits If a Property is Proposed Construction near an active or abandoned Slush Pit, the Appraiser must require a survey to locate the pit. The Mortgagee is to assess any impact on the subject Property.
4Special Airport Hazards486 ch
(4) Special Airport Hazards If a New Construction Property is located within Runway Clear Zones (also known as Runway Protection Zones) at civil airports or within Clear Zones at military airfields, the Mortgagee must reject the Property for insurance. Properties located in Accident Potential Zone 1 (APZ 1) at military airfields may be eligible for FHA mortgage insurance provided that the Mortgagee determines that the Property complies with Department of Defense guidelines.
5Flood Hazard Areas1,227 ch
(5) Flood Hazard Areas If any portion of the dwelling and related Structures or equipment essential to the Property Value is located in a Special Flood Hazard Area (SFHA), the Mortgagee must reject the Property, unless the Mortgagee: • obtains a Federal Emergency Management Agency (FEMA)-issued final Letter of Map Amendment (LOMA) or final Letter of Map Revision (LOMR) that removes the Property from the SFHA; or • obtains a FEMA National Flood Insurance Program (NFIP) Elevation Certificate (FEMA Form FF-206-FY-22-152) that documents that the lowest floor of the residential building, including the basement, and all related Structures or equipment essential to the Property Value are built above the 100-year flood elevation in compliance with the NFIP criteria; and • ensures that the Elevation Certificate is completed based on finished construction. The Mortgagee must include the LOMA, LOMR, or FEMA NFIP Elevation Certificate (FEMA Form FF-206-FY-22-152) with the case when it is submitted for endorsement. The Mortgagee must ensure that Flood Insurance is obtained when a FEMA NFIP Elevation Certificate (FEMA Form FF-206-FY-22-152) documents that the Property remains located within an SFHA.
6Individual Water Supply Systems (Wells)2,513 ch
(6) Individual Water Supply Systems (Wells)488 ch
(6) Individual Water Supply Systems (Wells) The Mortgagee must ensure that new wells are drilled and are no less than 20 feet deep and cased. Casing should be steel or other casing material that is durable, leak-proof, and acceptable to either the local health authority or the trade or profession licensed to drill and repair wells in the local jurisdiction. A well located within the foundation walls of New Construction is not acceptable except in arctic or subarctic regions.
aRequirements for Well Water Testing1,826 ch
(a) Requirements for Well Water Testing A well water test is required for all newly constructed Properties. All testing must be performed by a disinterested third party. This includes the collection and transport of the water sample collected at the water supply source. The sample must be collected and tested by the local health authority, a commercial testing laboratory, a licensed sanitary engineer, or other party that is acceptable to the local health authority. At no time will the Borrower/owner or other Interested Party collect and/or transport the sample. The following tables provide the minimum distance required between wells and sources of pollution: Water Well Location Minimum Property Standards for New Construction 24 CFR § 200.926d(f)(3)(iv)* 1 Property line/10 feet 2 Septic tank/50 feet 3 Absorption field/100 feet 4 Seepage pit or cesspool/100 feet 5 Sewer lines with permanent water tight joints/10 feet 6 Other sewer lines/50 feet 7 Chemically poisoned soil/25 feet (reduced to 15 feet where ground surface is protected by impervious strata of clay, hardpan or rock) 8 Dry well/50 feet Water Well Location Minimum Property Standards for New Construction 24 CFR § 200.926d(f)(3)(iv)* 9 Other – refer to local health authority minimums * distance requirements of local authority prevail if greater than stated above The following provides the minimum standards for Individual Water Supply Systems (wells): Individual Water System Minimum Property Standards for New Construction 24 CFR § 200.926d(f)(1) and (2) 1 Lead-free piping 2 If no local chemical and bacteriological water standards, state standards apply 3 Connection of public water whenever feasible 4 Wells must deliver water flow of five gallons per minute over at least a four-hour period
bRequired Documentation199 ch
(b) Required Documentation The Mortgagee must submit a valid water test from the local health authority or qualified lab. The report may not be more that 180 Days old from the Disbursement Date.
7Shared Well341 ch
(7) Shared Well A Shared Well is permitted if the requirements in Shared Wells are met. (B) Sales Comparison Approach: Comparable Selection For Properties in new subdivisions, the selected comparable sales must include at least one sale outside the subdivision or project and at least one sale from within the subdivision or project.
viiiCompletion of Construction272 ch
viii. Completion of Construction Regardless of the inspection process used, the Mortgagee must certify on form HUD- 92800.5B, Conditional Commitment Direct Endorsement Statement of Appraised Value, that the Property is 100 percent complete and meets HUD’s MPR and MPS.
Update 18 revision — optional now, mandatory 2026-11-10. Issued 2026-08-12 and stamped effective 2026-11-10. HUD's transmittal permits implementation immediately; it becomes required on 2026-11-10. A firm that has already adopted Update 18 should read this version.
8 sections · 13,921 characters of verbatim text. Open a section to read it, or . Every section below is in the page source whether open or closed.
iNew Construction (11/10/2026)897 ch
i. New Construction (11/10/2026) i. Definitions New Construction refers to Proposed Construction, Properties Under Construction, and Properties Existing Less than One Year as defined below: • Proposed Construction refers to a Property where no concrete or permanent material has been placed. Digging of footing is not considered permanent. • Under Construction refers to the period from the first placement of permanent material to 100 percent completion with no Certificate of Occupancy (CO) or equivalent. • Existing Less than One Year refers to a Property that is 100 percent complete and has been completed less than one year from the date of the issuance of the CO or equivalent. The Property must have never been occupied. FHA treats the sale of an occupied Property that has been completed less than one year from the issuance of the CO or equivalent as an existing Property.
iiEligible Property Types328 ch
ii. Eligible Property Types The following property types are eligible for New Construction financing: • Site Built Housing (one- unit, one-unit with an Accessory Dwelling Unit (ADU), or two- to four-units) • Condominium units in Approved Projects or Legal Phases • Manufactured Housing (one-unit or one-unit with an ADU)
iiiRequired Inspections for New Construction Financing4,031 ch
iii. Required Inspections for New Construction Financing59 ch
iii. Required Inspections for New Construction Financing
ASite Built Housing (By Construction Status at Time of Appraisal)1,867 ch
(A) Site Built Housing (By Construction Status at Time of Appraisal) The Mortgagee must obtain: (1) Proposed Construction • copies of the building permit (or equivalent) and CO (or equivalent); or • three inspections (footing, framing and final) performed by the local authority with jurisdiction over the Property or an ICC certified RCI or CI (for Modular Housing, footing and final only); or • in the absence of such ICC certified RCI or CI, the Mortgagee may obtain three inspections (footing, framing and final) performed by a disinterested third party, who is a registered architect, a structural engineer, or a qualified trades person or contractor, and has met the licensing and bonding requirements of the state in which the Property is located. (2) Under Construction • copies of the building permit (or equivalent) and CO (or equivalent); or • a final inspection issued by the local authority with jurisdiction over the Property or by an ICC certified RCI or CI; or • in the absence of such ICC certified RCI or CI, the Mortgagee may obtain a final inspection performed by a disinterested third party, who is a registered architect, a structural engineer, or a qualified trades person or contractor, and has met the licensing and bonding requirements of the state in which the Property is located. (3) Existing Less than One Year • a copy of the CO (or equivalent); or • a final inspection issued by the local authority with jurisdiction over the Property or by an ICC certified RCI or CI; or • in the absence of such ICC certified RCI or CI, the Mortgagee may obtain a final inspection performed by a disinterested third party, who is a registered architect, a structural engineer, or a qualified trades person or contractor, and has met the licensing and bonding requirements of the state in which the Property is located.
BManufactured Housing (By Construction Status at Time of Appraisal)1,975 ch
(B) Manufactured Housing (By Construction Status at Time of Appraisal) Inspection Requirements The Mortgagee must obtain: (1) Proposed Construction • copies of the building permit, (or equivalent) and CO (or equivalent); or • two inspections (initial and final) performed by the local authority with jurisdiction over the Property or an ICC certified RCI or CI; or • in the absence of a local authority with building code jurisdiction or ICC certified RCI or CI, the Mortgagee may obtain two inspections (initial and final) performed by a disinterested third party, who is a registered architect, a structural engineer, or a qualified trades person or contractor, and has met the licensing and bonding requirements of the state in which the Property is located. (2) Under Construction • copies of the building permit, (or equivalent) and CO (or equivalent); or • a final inspection performed by the local authority with jurisdiction over the Property or an ICC certified RCI or CI; or • in the absence of a local authority with building code jurisdiction or ICC certified RCI or CI, the Mortgagee may obtain a final inspection performed by a disinterested third party, who is a registered architect, a structural engineer, or a qualified trades person or contractor, and has met the licensing and bonding requirements of the state in which the Property is located. (3) Existing Less than One Year • a copy of the CO (or equivalent); or • a final inspection performed by the local authority with jurisdiction over the Property or an ICC certified RCI or CI; or • in the absence of a local authority with building code jurisdiction or ICC certified RCI or CI, the Mortgagee may obtain a final inspection performed by a disinterested third party, who is a registered architect, a structural engineer, or a qualified trades person or contractor, and has met the licensing and bonding requirements of the state in which the Property is located.
CUnits in Condominium Project or Legal Phase (Existing Less Than One Year)130 ch
(C) Units in Condominium Project or Legal Phase (Existing Less Than One Year) The Mortgagee must obtain a CO or its equivalent.
ivRequired Documentation for New Construction Financing2,160 ch
iv. Required Documentation for New Construction Financing The Mortgagee must obtain and include the following documents in the case binder: • form HUD-92541, Builder’s Certification of Plans, Specifications, and Site; • form HUD-92544, Warranty of Completion of Construction; • required inspections, as applicable: • inspections performed by an ICC certified RCI or CI or a third-party, who is a registered architect, a structural engineer, or a qualified tradesperson or contractor must be reported on form HUD-92051, Compliance Inspection Report, or on an appropriate state-sanctioned inspection form; and • when a third party, who is a registered architect, a structural engineer, or a qualified tradesperson or contractor, is relied upon for required inspections due to the absence of an ICC certified RCI or CI, a certification from such inspector that they are licensed and bonded under applicable state and local laws to perform the type of inspection completed must be included; • Wood Infestation Report, unless the Property is located in a county listed as not required on HUD’s “Termite Treatment Exception Areas” list: o Form HUD-NPMA-99-A, Subterranean Termite Protection Builder’s Guarantee, is required for all New Construction. If the building is constructed with steel, masonry or concrete building components with only minor interior wood trim and roof sheathing, no treatment is needed. The Mortgagee must ensure that the builder notes on the form that the construction is masonry, steel, or concrete. o Form HUD-NPMA-99-B, New Construction Subterranean Termite Service Record, is required when the New Construction Property is treated with one of the following: Termite Bait System, Field Applied Wood Treatment, soil chemical termiticide, or Physical Barrier System is installed, as reflected on form HUD-NPMA-99-A. The Mortgagee must reject the use of post construction soil treatment when the termiticide is applied only around the perimeter of the foundation. • local health authority or qualified lab well water analysis; and • septic report, where required by the local jurisdictional authority.
vDocuments to be Provided to Appraiser at Assignment669 ch
v. Documents to be Provided to Appraiser at Assignment The Mortgagee must provide the Appraiser with a fully executed form HUD-92541, signed and dated no more than 30 Days prior to the date the appraisal was ordered. For Properties 90 percent completed or less, the Mortgagee must provide a copy of the floor plan, plot plan, and any other exhibits necessary to allow the Appraiser to determine the size and level of finish of the house they are appraising. For Properties greater than 90 percent but less than 100 percent completed, the Mortgagee must provide the Appraiser with a list of components to be installed or completed after the date of inspection.
viProperty Considerations142 ch
vi. Property Considerations New Construction must meet HUD’s Minimum Property Requirements (MPR) and Minimum Property Standards (MPS).
viiMortgagee Review of Appraisal5,422 ch
vii. Mortgagee Review of Appraisal61 ch
vii. Mortgagee Review of Appraisal (A) Site Considerations
1Environmental276 ch
(1) Environmental The Mortgagee must require corrective work to mitigate any condition that arises during construction that may affect the health and safety of the occupants, the Property’s ability to serve as collateral, or the structural soundness of the improvements.
2Operating Oil or Gas Wells206 ch
(2) Operating Oil or Gas Wells If a New Construction dwelling is located within 75 feet of an operating oil or gas well, the Mortgagee must reject the Property unless mitigation measures are completed.
3Slush Pits215 ch
(3) Slush Pits If a Property is Proposed Construction near an active or abandoned Slush Pit, the Appraiser must require a survey to locate the pit. The Mortgagee is to assess any impact on the subject Property.
4Special Airport Hazards486 ch
(4) Special Airport Hazards If a New Construction Property is located within Runway Clear Zones (also known as Runway Protection Zones) at civil airports or within Clear Zones at military airfields, the Mortgagee must reject the Property for insurance. Properties located in Accident Potential Zone 1 (APZ 1) at military airfields may be eligible for FHA mortgage insurance provided that the Mortgagee determines that the Property complies with Department of Defense guidelines.
5Flood Hazard Areas1,227 ch
(5) Flood Hazard Areas If any portion of the dwelling and related Structures or equipment essential to the Property Value is located in a Special Flood Hazard Area (SFHA), the Mortgagee must reject the Property, unless the Mortgagee: • obtains a Federal Emergency Management Agency (FEMA)-issued final Letter of Map Amendment (LOMA) or final Letter of Map Revision (LOMR) that removes the Property from the SFHA; or • obtains a FEMA National Flood Insurance Program (NFIP) Elevation Certificate (FEMA Form FF-206-FY-22-152) that documents that the lowest floor of the residential building, including the basement, and all related Structures or equipment essential to the Property Value are built above the 100-year flood elevation in compliance with the NFIP criteria; and • ensures that the Elevation Certificate is completed based on finished construction. The Mortgagee must include the LOMA, LOMR, or FEMA NFIP Elevation Certificate (FEMA Form FF-206-FY-22-152) with the case when it is submitted for endorsement. The Mortgagee must ensure that Flood Insurance is obtained when a FEMA NFIP Elevation Certificate (FEMA Form FF-206-FY-22-152) documents that the Property remains located within an SFHA.
6Individual Water Supply Systems (Wells)2,610 ch
(6) Individual Water Supply Systems (Wells)488 ch
(6) Individual Water Supply Systems (Wells) The Mortgagee must ensure that new wells are drilled and are no less than 20 feet deep and cased. Casing should be steel or other casing material that is durable, leak-proof, and acceptable to either the local health authority or the trade or profession licensed to drill and repair wells in the local jurisdiction. A well located within the foundation walls of New Construction is not acceptable except in arctic or subarctic regions.
aRequirements for Well Water Testing1,825 ch
(a) Requirements for Well Water Testing A well water test is required for all newly constructed Properties. All testing must be performed by a disinterested third party. This includes the collection and transport of the water sample collected at the water supply source. The sample must be collected and tested by the local health authority, a commercial testing laboratory, a licensed sanitary engineer, or other party that is acceptable to the local health authority. At no time will the Borrower/owner or other Interested Party collect and/or transport the sample. The following tables provide the minimum distance required between wells and sources of pollution: Water Well Location Minimum Property Standards for New Construction 24 CFR § 200.926d(f)(3)(iv)* 1 Property line/10 feet 2 Septic tank/50 feet 3 Absorption field/100 feet 4 Seepage pit or cesspool/100 feet 5 Sewer lines with permanent water tight joints/10 feet 6 Other sewer lines/50 feet 7 Chemically poisoned soil/25 feet (reduced to 15 feet where ground surface is protected by impervious strata of clay, hardpan, or rock) 8 Dry well/50 feet Water Well Location Minimum Property Standards for New Construction 24 CFR § 200.926d(f)(3)(iv)* 9 Other – refer to local health authority minimums * distance requirements of local authority prevail if greater than stated above The following provides the minimum standards for Individual Water Supply Systems (wells): Individual Water System Minimum Property Standards for New Construction 24 CFR § 200.926d(f)(1) and (2) 1 Lead-free piping 2 If no local chemical and bacteriological water standards, state standards apply 3 Connection of public water whenever feasible 4 Wells must deliver water flow of five gallons per minute over at least a four-hour period
bRequired Documentation297 ch
(b) Required Documentation The Mortgagee must obtain a valid water test from the local health authority or a lab qualified to conduct water testing in the jurisdictional state or locality. When a well test is required, the report may not be more than 180 Days old from the Disbursement Date.
7Shared Well341 ch
(7) Shared Well A Shared Well is permitted if the requirements in Shared Wells are met. (B) Sales Comparison Approach: Comparable Selection For Properties in new subdivisions, the selected comparable sales must include at least one sale outside the subdivision or project and at least one sale from within the subdivision or project.
viiiCompletion of Construction272 ch
viii. Completion of Construction Regardless of the inspection process used, the Mortgagee must certify on form HUD- 92800.5B, Conditional Commitment Direct Endorsement Statement of Appraised Value, that the Property is 100 percent complete and meets HUD’s MPR and MPS.
Operationalizing FHA Single Family Housing Policy Handbook 4000.1, II. ORIGINATION THROUGH POST-CLOSING/ENDORSEMENT > A. Title II Insured Housing Programs Forward Mortgages > 8. Programs and Products - New Construction (11/10/2026) — i. New Construction
This is verbatim, source-snapshotted regulator text from the Claude for Compliance open corpus. To turn a rule like this into compliance work product: gap-analyze your policies and procedures (P&Ps) against these requirements to surface stale, conflicting, or missing provisions; operationalize any change with a ready-to-run update kit; and produce audit-ready evidence — every step grounded only in the regulator’s own words, never invented.
To work from the whole rulebook rather than this one page: download the corpus — every register on this site, verbatim, each with its source snapshot and effective date — then follow the methodology. It asks your assistant to answer only from the downloaded text, cite the register id and effective date it used, and tell you when the corpus does not cover something instead of filling the gap from memory. Running it locally also means no one sees which regulations you are looking at.
Source of record: https://claudeforcompliance.com/regs/hud-4000-1-programs-and-products-new-construction/
· register hud-4000-1-programs-and-products-new-construction · Claude for Compliance. Free to read and download;
see regulatory updates and methodology.